Overall Thornton Water Project Pipeline – total 74 Miles Pipeline Length – Larimer / Weld / Adams (incorporated and unincorporated)
Adams – 12 Miles = (3.5 miles unincorporated & 8.5 miles Thornton)
Larimer – 12 Miles – all unincorporated
Weld – 50 Miles = (34 miles unincorporated 16 miles incorporated)
Timnath = 5.5 miles, Severance = less than a ¼ mile, Windsor = 4.2 miles, Johnstown = 3.7 miles, Platteville = a short distance, Firestone = 2 miles, Frederick = .5 miles,
Dacono = A short distance