Project Maps – County Road 56

We proposed a preferred route along County Road 56 in December 2018.

The preferred route in Larimer County starts at the south end of Water Supply and Storage Company (WSSC) reservoir #4, then goes along the eastern side of the Braidwood Community, across WSSC property, and then along the northwestern edge of the Eagle Lakes Community. The pipeline would then turn east, cross Highway 1, and then go generally along the County Road 56 alignment, eventually reaching County Line Road. At County Line Road the pipeline route would head south through Timnath, Windsor and Johnstown before entering Weld County.

  • Thornton Water Project Corridor – LCR 56 to LCR 14
  • Thornton Water Project Corridor – Shields Street to Highway 1
  • Thornton Water Project Corridor – Highway 1 to County Line Road